House

Posts having to do with the new Lake Wylie house

  • The Roof Is Going On

    We went out to the site this morning to meet with Sonia.  We were there to talk about the kitchen layout and to pick up cabinet samples.  We’re picking out cabinetry for every room that needs it.  When we arrived we saw a couple of vans with ladders on them pulling up.  It seems that…

  • A Little More Progress

    Last week we met the wife of the builder out at a plumbing supply store about twenty minutes away.  Sonia is Chuck’s partner in business.  He takes care of the outside and she handles the stuff on the inside.  We wanted to start the process of picking out sinks and fixtures.  It’s time to start…

  • Framing Starts

    The weather is really drawing things out.  When we moved here, and while we were waiting for permits the area was in the middle of a mini-drought.  The lake was getting pretty low … so low that they had to close a bunch of the boat launches.  We even saw some boats that were at docks and…

  • The Decking

    After the foundation was complete the decking and subfloor went in.  The footprint looks kind of small.  I know that sound ridiculous considering the picture of Noah taken from one corner of the house to the other, but considering everything that needs to go in there it looks small.  We’ve been assured that will change…

  • The Foundation

    Mid-way through September they finally got started on the foundation.  We’re going to have a crawl space so they build the brick and block up directly from the footers.  One of the final steps in the construction process will be to do a final level of the ground beneath the house and the installation of…

  • The Footers Go In

    When we got back from Disney we had to go by the lot to see if any progress had been made.  We knew when we left that we were close to getting the permits, but we weren’t sure if anything would be done or not.  We were happy to see that we’d received the illusive…

  • Clearing the lot

    This is a sequence of pictures that shows the lot clearing process starting from a point where there was no clearing done at all. This will be the first in a number of posts that will come pretty quickly.  I’m going to try to get caught up to the present. Our builder had a rough…